Gallery

Home Gallery

WAREHOUSE AT TAJNAGAR

TAJNAGAR PROJECT

Ecoplus Industries Pvt. Ltd. is proud to announce the construction of a state-of-the-art Pre-Engineered Building (PEB) located in Tajnagar. This ambitious project is designed to meet the highest standards of quality, sustainability, and functionality, leveraging the latest advancements in construction technology.

Project Location

  • Site: Tajnagar

Project Specifications

  • Total Weight: 590 metric tons
  • Building Type: Pre-Engineered Building (PEB)
  • Construction Material: High-grade steel, eco-friendly materials, and advanced insulation

Project Scope

The scope of this project includes the design, fabrication, and erection of the PEB structure, ensuring it meets the specific requirements of the client and adheres to all relevant building codes and standards.

Design Phase

  • Architectural Design: Customized to client specifications, incorporating modern aesthetics and functional layouts.
  • Structural Design: Engineered to withstand environmental loads and ensure durability.
  • Sustainability: Incorporation of eco-friendly materials and energy-efficient systems.

Fabrication Phase

  • Material Selection: Use of high-grade steel and sustainable materials.
  • Quality Control: Rigorous quality checks at every stage of fabrication.
  • Precision Manufacturing: Utilization of advanced machinery and technology to ensure precise fabrication.

Erection Phase

  • Site Preparation: Clearing and leveling of the site, ensuring a strong foundation.
  • Assembly: Efficient and safe assembly of prefabricated components.
  • Safety Measures: Adherence to all safety protocols and guidelines during construction.

Key Features

  • Durability: Robust structure designed to last for decades.
  • Flexibility: Modular design allows for future expansion and customization.
  • Energy Efficiency: Incorporation of insulation and energy-efficient systems.
  • Sustainability: Use of eco-friendly materials and practices.

Project Timeline

  • Design Phase: 2 months
  • Fabrication Phase: 4 months
  • Erection Phase: 3 months
  • Total Duration: 9 months

This PEB project by Ecoplus Industries Pvt. Ltd. in Tajnagar is a testament to the company's commitment to innovation, quality, and sustainability. With a total weight of 590 metric tons, this building is designed to meet the specific needs of the client while promoting eco-friendly construction practices.